As-Built Survey Dubai:
DM Submission, NOC & Handover Requirements

June 2026 • 7 min read • By Fortress Surveying Engineering Services

An as-built survey documents the actual constructed positions, levels and dimensions of a completed building or infrastructure project. In Dubai, as-built surveys are a mandatory requirement for obtaining a Dubai Municipality Completion Certificate and the No Objection Certificate (NOC) needed before handover to end users or registration with DLD.

Important: Dubai Municipality will not issue a Completion Certificate without an approved as-built survey certified by a licensed DM-registered surveyor. Using an uncertified surveyor is one of the most common reasons for handover delays in Dubai.

What is an As-Built Survey?

An as-built survey records what was actually built on site — not what was shown on the original approved drawings. The survey compares the completed structure against the approved permit drawings and highlights any variations. The output is a set of as-built drawings showing:

Dubai Municipality As-Built Requirements

DM has specific requirements that must be met for an as-built survey to be accepted:

RequirementDM Standard
Surveyor LicenceMust be DM-registered licensed surveyor
Coordinate SystemWGS84 / UTM Zone 40N
Height DatumEGM2008
Drawing FormatAutoCAD DWG + stamped PDF
Submission PortalDM e-submission (Ejari/Makani)
CertificationLicensed engineer stamp & signature

Common Reasons for DM As-Built Rejection

Fortress Surveying maintains a 99% first-submission acceptance rate because we know exactly what DM reviewers check. The most common rejection reasons are:

As-Built Survey Process at Fortress Surveying

  1. Obtain approved drawings — we review original DM permit drawings
  2. Field survey — total station measurement of all completed elements
  3. CAD drafting — as-built drawings produced to DM format
  4. Variation check — comparison table prepared
  5. DM submission — we handle the full e-submission on your behalf
  6. Correspondence — we respond to any DM reviewer queries

Need an As-Built Survey in Dubai?

Fortress Surveying is DM-registered and handles the full submission process. 99% first-time acceptance rate. Quote in 2 hours.

Get a Quote WhatsApp

Frequently Asked Questions

How long does an as-built survey take in Dubai?

Field survey for a typical residential building takes 1–2 days. Full as-built drawings are delivered within 48–72 hours. DM review typically takes 3–7 working days after submission.

What is the cost of an as-built survey in Dubai?

As-built surveys typically start from AED 2,500 for residential villas, with larger commercial and mixed-use projects quoted on scope. Contact Fortress Surveying for a fixed-price quote within 2 hours.

Can you handle the DM submission on our behalf?

Yes — Fortress Surveying is fully registered on the DM e-submission portal and handles all correspondence with DM reviewers, including responding to queries and resubmissions if needed.

DM Approved Surveyor
DLD Registered
RERA Compliant
DCAA Drone Permit
Dubai-Only Operations
Call Now WhatsApp