Sun–Thu 7am–6pm · Sat 7am–2pm GSTWhatsApp Us

How we work: control point to certified delivery.

A clear, repeatable process behind every survey, so you always know what happens next and what you'll receive.

Step by step

The Fortress survey process.

01 · ENQUIRY

Send us your project details.

Share whatever you have: a plot number, site coordinates, approved drawings, or simply a description of what you need. WhatsApp, email or the website form all work.

Plot number or site location pin
Survey type needed (or ask us to recommend)
Any drawings or previous survey files
Your timeline and any authority deadlines
Takes you: 2 minutes
Fixed-price, no hidden extras
02 · QUOTATION

A clear, fixed-price quote.

We review the scope against DM/authority requirements and reply with a fixed price and a clear deliverables list, with no vague estimates and no hidden extras.

One fixed price covering field work, processing and deliverables
Exact list of what you'll receive and in which formats
Committed site date and delivery date
03 · PREPARATION

Survey planning & records check.

Before mobilising, we pull the relevant records and plan the field methodology, so site time is spent measuring, not figuring things out.

DLD title coordinates and affection plan review (boundary work)
Approved drawing review and control datum verification
Equipment calibration check and method selection
Verifying a control point before survey work begins
Fortress Surveying engineer on site with GNSS rover
04 · FIELD WORK

Site survey by licensed engineers.

Our team mobilises with survey-grade Leica/Trimble instruments. Control is established or verified first, then measurement proceeds to the accuracy standard the job demands.

Control network established to Dubai Municipality datum standards
Redundant measurements on critical points
Field checks before demobilising: nothing left to chance
05 · PROCESSING & QA

Data processing with two-stage checking.

Field data is processed into your deliverables and independently checked before anything leaves our office. This QA/QC discipline stands behind every drawing we issue.

CAD production layered to DM drawing standards
Independent check by a second engineer
Signed and stamped by our DM-registered surveyor
Checked and signed before delivery
Fortress Surveying team finalising a control point marker
06 · DELIVERY

Deliverables issued + DM e-submission.

You receive everything digitally, and where authority submission is part of the job, we handle the DM portal upload and any reviewer correspondence until acceptance.

DWG + signed PDF + coordinate/point files issued to you
DM e-portal submission handled where required
Free clarification support after delivery
Quality system

Three layers of quality control.

1. Instrument integrity

Calibration-current Leica and Trimble instruments only, with calibration certificates available on request.

2. Field redundancy

Critical points measured redundantly and closed back to control before the team leaves site.

3. Independent office check

Every deliverable is checked by an engineer who didn't produce it, then signed by our DM-registered surveyor.

Ready for step one?

Send your site details now and get a clear, fixed-price quote for your project.

Call NowWhatsApp