Mandatory documentation comparing completed construction against approved permit drawings — required for DM Completion Certificate and NOC before handover and DLD registration.
Every sub-service below is delivered in-house by our licensed engineers — no subcontracting, one accountable team.
The measured record DM requires for Building Completion Certificates — geometry, levels and setbacks documented.
Completion documentation for villas including extensions, boundary walls and site features.
As-constructed positions and levels of structural elements verified against approved drawings.
Surveyed positions of visible services and connection points supporting MEP as-built drawing production.
Internal area computation supporting RERA and sales documentation.
Roads, networks and external works documented in authority handover formats.
Clear tabulation of where construction differs from design — and by how much.
Converting site markups into clean, layered as-built CAD deliverables.
Get a fixed-price quote within 2 hours. DM compliant, fast mobilisation across all Dubai zones.